|
|
|
-
|
stain + paint not completed-
throughout.
|
_____________
|
_____________
|
|
|
|
|
scrreens + cranks
|
_____________
|
_____________
|
|
|
|
|
cleaning
|
_____________
|
_____________
|
|
|
|
|
|
FLOORING
|
floor dips/deviates at
carpet joint approx 4 feet from east wall.
|
_____________
|
_____________
|
|
|
|
|
|
ELECTRICAL/LIGHTING
|
TBI
|
_____________
|
_____________
|
|
|
|
|
|
WALLS
|
REQUIRED TOUCH UP in
closet
|
_____________
|
_____________
|
|
|
|
|
|
TUB
|
CAULK needed at base
|
_____________
|
_____________
|
|
|
|
COUNTERTOPS
|
sidsplash on left cracked
..or sratched
|
_____________
|
_____________
|
|
|
|
ELECTRICAL/LIGHTING
|
BULB needed on strip
light
|
_____________
|
_____________
|
|
|
|
|
|
FRONT DOORS
|
caulking needed at
base.
|
_____________
|
_____________
|
|
|
|
|
|
-
|
DRYWALL REPAIR needed- joint
visablbe 3-4 foot length.
|
_____________
|
_____________
|
|
|
|
|
|
CABINETS
|
upper blind corner cabinet
door not shutting flush
|
_____________
|
_____________
|
|
|
|
|
fridge upper- doors
rubbing
|
_____________
|
_____________
|
|
|
|
ELECTRICAL/LIGHTING
|
fridge plug?- is that
normal?
|
_____________
|
_____________
|
|
|
|
|
|
WALLS
|
HOLE by tub drain ???
|
_____________
|
_____________
|
|
|
|
|
|
WINDOWS
|
window fell out
|
_____________
|
_____________
|
|
|
|
|
|
-
|
major driveway impediment- cable/telephone
boxes in middle of driveway.
|
_____________
|
_____________
|
|
|
|
|
cracks in garage
floor.
|
_____________
|
_____________
|
|
|
|
|
dent in easetrough at front
of home- above small bahroom window---galvanized step flashing
visable.
|
_____________
|
_____________
|
|
|
|
BRICKS
|
brick ledge level or leaning
towards house in bedroom #2
|
_____________
|
_____________
|
|
|
|
SHINGLES
|
buckling alongright side of
valley- visable from upper deck
|
_____________
|
_____________
|
|
|
|
PORCH
|
electrical box
crooked.
|
_____________
|
_____________
|
|
|
|
|
trim or something needed
around xmas recepticle.
|
_____________
|
_____________
|
|
|