FYI
-----Original
Message-----
From: Ria Won
[mailto:ria.won@gmail.com]
Sent: Wednesday,
February 16, 2011 2:04
PM
To: Maria Rasile
Subject: unfinished business and new
problems
Good afternoon and i hope your day is going well
.
Just wondering when our LARGE WALL CORNER CRACK on the third floor of
43 coulter st 3rd floor beside elevator on other of door way will be
fixed Quite a eye sore and shabby to see.
Also we have a new problem on
the third floor also at end of hall , on floor landing facing the parking lot
.The floor tiles are moving and need to be glued down so you dont see the wood
sub floor beneath.The floor tiles on the first floor at the door entrance to the
parking lot are lifting due to excessive water from snow etc ,this will be
a problem later on for sure ,We need that whole entrance area to have
ceramic tiles because this entrance is used ,More than the Front Door , to
43 coulter st therefor we should have the same tiles in this area as the front
door area.
Please let me know your thoughts and answers to the above,
Best
regards and have a good week .WE INSIST FEE /RIA
43 coulter st unit 24