Everything on your list of completed items
has been fixed from what I can tell, except for the following (see comments for
each in red)...
> From: service@pratthomes.ca
> To:
michelle_vaters@hotmail.com
> Subject: RE: Service/Repairs for Unit 39-304
on Mon. June 11th
> Date: Fri, 15 Jun 2012 12:12:18 -0400
>
>
Good Morning Michelle;
>
> Sorry I hadn't responded to your email
until today, as I had to wait to get
> the completed work orders from the
tirades that had done work in your condo.
>
> Sunview Ptio doors
completed the repairs on the Patio door track by
> replacing the track and
adjusted the door lock and replaced the screen door.
> repaired the hole
in screen
>
> Cartier Kitchens has done all the repairs requested,
>
> KITCHEN- - CABINETS-SCRATCHED PANEL WHERE MARKED ON PENINSULA
FACING LIVING
> ROOM. UPPER CABINET FAR LEFT OF STOVE SCRATCHED AT TOP,
ADJUST ALL CABINETS.
> COUNTER TOP CHIPPED TO LEFT OF STOVE
>
**completed by trade- June 11/12**
>
> KITCHEN- -
COUNTERTOPS-COUNTERTOP NOT SECURED TO END PANEL
> **completed by trade-
June 11/12**
>
> Main Bathroom- Cabinets - Kitchen & Bathroom-
chip on the left door of
> cabinet
> **completed by trade- June
11/12**
>
> Kitchen- Cabinets - Kitchen & Bathroom- the shelf
in the cupboard above the
> microwave is cracked **completed by trade-
June 11/12**
>
> Kitchen- Cabinets - Kitchen & Bathroom-
scratched panel where marked with a
> "fix it sticker" on the peninsula
facing the living room **completed by
> trade- June 11/12**
>
> Kitchen- Cabinets - Kitchen & Bathroom- upper cabinetry (on valance
area
> near ceiling) far left of stove is **completed by trade- June
11/12**
>
> Kitchen- Cabinets - Kitchen & Bathroom- adjust all
cabinets and drawers
> **completed by trade- June 11/12**
>
> Kitchen- Cabinets - Kitchen & Bathroom- counter top is chipped to
the left
> of the stove
> **completed by trade- June
11/12**
>
> Still to be repaired on July 6th:
>
>
Exterior- Railings - Exterior- balcony railing is scratched
> Laundry
Room- Painting- paint required on wall to the right of the hot water
>
tank
> Kitchen- Drywall- bowed wall behind the sink creating a crooked
backsplash:
> Gary will assess & advise the Service Manager Wendy
Skyba
> Master Bedroom- Drywall fix corner bead and paint to the left of
the window
> where the fix it sticker is
> Main Bathroom- Drywall
dark line on wall between the toilet and bathtub
> where the fix it
sticker is
> Main Bathroom- Electrical- fan doesn't turn on when the
switch in the
> bathroom is flipped on, or the switch outside the bathroom
is switched on
>
> I will set up another work order to adjust the
cabinets and Liana Hammond of
> Cartier will call you with a service date.
Can you email me a picture of the
> repair to the counter top with a ruler
or tape measure beside it then a
> picture of the repair without a
measurement but standing 5 ft away?
>
> Thank you.
>
>
Ramona Gross
> Service Department
> Pratt Hansen Group Inc.
>
Tel: (705)721-9912 Fax: (705)735-6991
>
> -----Original
Message-----
> From: Michelle Vaters [mailto:michelle_vaters@hotmail.com]
> Sent: Monday, June 11, 2012 7:57 PM
> To: service
>
Subject: Service/Repairs for Unit 39-304 on Mon. June 11th
> Importance:
High
>
> Hi Ramona,
>
> Could you please send me a
list of repairs that were completed in my unit
> today (June
11th)?
>
> I noticed that all cabinets and drawers were not
adjusted by Cartier
> kitchens as requested. Also, they attempted to patch
the chip in my
> countertop, instead of replacing it, which is
unacceptable as I expect
> everything to look new, which is the reason I
purchased a new build instead
> of a resale. Did they just do this in the
interim until they can order and
> replace the piece of countertop? Please
let me know.
>
> Thanks,
> Michelle.=
>